Skip to Content


Renovating bathroom with wall-mounted elements

Some bathrooms are getting on in years and require urgent renovation.




The renovation starts with the installation of the self-supporting wall-mounted element for the WC. The installation is simplified considerably by wall- and floor rails.


The sewage pipe is connected to the WA element.


Blank elements are used to create a partition, which can then be used to install a shower.


Simple installation: Marley wall-mounted cabinets include among other things, side panels, connecting sections and all fittings.


Simple installation: Marley wall-mounted cabinets include among other things, side panels, connecting sections and all fittings.


The system can be processed easily; you need only to plug it in. No soldering and pasting.


The pressure is tested with a press-on pump after the water pipe is installed.


Connecting the actuator plate is easy and uncomplicated with the new Bowden Control Cable technology. The actuator plates come in different designs and colours.


You can realize your bathroom dreams easily with Marley wall-mounted cabinets.

All delivery and discharge pipes are laid behind the wall-mounted elements.

It looks really beautiful...