Skip to Content


Installation


1. For the assembly of the gutter route it without cutting through the neck. Mark the hole for the rain water pipe. The hole that has been marked may now be cut out with a metal saw (or power drill saw).


2. Fit the gutter end piece, it fits on both the left and right sides, but it does not fit into the down pipe neck.


3. For the connection of the downpipe the pipe support with ring screw is used: The pipe support is simply tightened with a self-tapping screw.


4. An easy and proven assembly of the gutter with iron bracket.


5. Pipe bellows with 45° and 67° bend offer the suitable solution for every roof excess end.






Advantages of Marley gutters

  • Simple and fast to install
  • High-quality plastics
  • 10-year guarantee
  • Meet the demands set by the DIN EN 607 quality standards:
  • Age-resistant and fade-proof
  • Optimal form stability and fitting accuracy
  • Durable and resilient
  • High resistance against weather, UV and temperatures